Slower than expected progress is being made on the new roof shingle...it is about 50% done and it should be completed by the end of Saturday.  Windows will go in next week and siding will follow shortly after that.  The exterior should be complete before the really cold weather gets here.
 
west side of main roof / addition roof

                                                                   
new electrical service drop
The electrician has set a new exterior mounted drop for the electrical service wire and installed a new electrical panel.  The electrical boxes and conduit will be installed in the next few days.  Monday the mechanical ductwork installation will begin.  This will take 3-4 days to complete.  The  plumbing rough-in work will also start early next week.  This could be somewhat of an experiment to have all three trades working in the same house at one time......even though they do this on HGTV all the time it's not usually how it works in general practice.  I think the sub-contractors have worked together before so it should be fine.  The plumber has the right-of-way because he is dealing with gravity.  If all goes well the electrical, mechanical and plumbing rough-in should all be completed by the end of next week.  This would be great and would make up for a little lost time in the schedule.  
 
We made a design change in the master bedroom by raising the ceiling height up to about 12'...this creates a great volume in the bedroom.  Windows on the north and east side add nice natural lighting with good cross ventilation.  


master bedroom with raised ceiling


  We have completed the design of the real estate site sign.  This will be fabricated and installed next week.  After 6 weeks of construction we are about halfway done...this is slightly ahead of schedule.  I estimate our completion date to be about January 13th, 2012. Our General Contractor, Real Estate Agent  and the Ownership Group are all very pleased with the progress and current overall look of the project.                              